33 YEARS OF PROFESSIONAL SALES AND SERVICE

REQUEST A QUOTE
1981 Schramm T685 DHH Drill Rig
1981 Schramm T685 DHH Drill Rig1981 Schramm T685 DHH Drill Rig

1981 Schramm T685 DHH Drill Rig

$85,000.00

SKU: 248- Category:

REQUEST PRICING

We appreciate your interest in Used Rigs, Please enter your contact information and any additional
information and a representative will contact you shortly.

Product Description

1981 Schramm T685 DHH 80,000 lb pullback

Mounted on GMC truck, 6V53 Detroit Diesel

Serial #1524

Deck Engine 12V71 Detroit Diesel

Sullair 850/350 air compressor

Well maintained drill, ready to go

Maintenance
  
May. 30, 1994
 
 
Changed cab, rebuilt radiator, replaced foot valve, changed wiring & dash from one truck to the other, changed
 
engine from 985 frame, replaced heater hoses, air filter, fuel filter, oil filter & fuel lines, floor mat, seat cover &
 
starter solenoid, serviced rig, replaced air hose, hole pressure gauge & u-joints in fan shaft, replaced six hydraulic
 
hoses
  
June.8, 1994
 
 
Replace L. H. turbo & L4 injector (12V), lined up funk gear box, adjusted throttle cable
  
Sept.. 1994
 
 
Changed rotation head, changed a lot of hydraulic hoses, put kit in slow feed valve, checked lights, repaired air
 
leak in transmission lines, replumbed bean pump, serviced truck
  
Sept., 1995
 
 
Changed rotation head to new style, replaced both rotation motors, removed air valve & rerouted return, removed
 
one chain link, repacked derick cylinder, welded hydraulic & fuel tanks, tightened clutch, checked & tightened V12
 
fan belts, replaced micro feed valve, removed thermostat from compressor, checked compressor, replaced Dexron
 
fluid level gauge, one Dexron hose, replaced two tail lights, serviced rig & truck, replaced 12V radiator core &
 
compressor unload cylinder, touched up paint (sides of rig)
  
Mar.31, 2002
 
 
R & R  right hand jack cylinder & replaced wear strips, replaced front jack cylinder, safety block, replaced right
 
hand rear cylinder & pins, replaced safety check valve, block valve, winch control valve & soap pump valve,
 
reconditioned power head cylinders
  
Apr.24, 2002
 
 
Replaced 6 injectors & fuel lines on right hand bank, set timing, ran overhead
  
Jun.4, 2002
 
 
Replaced left traverse cylinder & check valve
  
Jun.15, 2002
 
 
Installed new pins in power head, installed new bracket & sprockets on left side, installed new chains & adjusted,
 
replaced screw in shifter knob
  
Jan.13, 2004
 
 
Checked charging system & installed volt gauge
  
Jan.27, 2004
 
 
Replaced 2 1/2 inch hose on compressor, welded fittings on head box
  
Feb.4, 2004
 
 
Replaced toggle switch for lights, replaced 2 inch crossover hose
  
Feb. 20, 2004
 
 
Rewired back panel of drill
  
Feb. 26, 2004
 
 
Replaced solenoid
  
Feb. 27, 2004
 
 
Repaired short in wiring
  
  
Mar. 10, 2004
 
 
Welded clutch arm
  
Mar. 19, 2004
 
 
Rplaced top seal & repacked air packing
  
July. 2, 2004
 
 
Replaced front blower, fuel pump, three injectors & all blower drive components & adjusted rack (12V71)
  
Feb. 3, 2005
 
 
Changed oil, greased, blew out air filters
  
Feb. 14, 2005
 
 
Replaced air filters
  
Mar.3, 2005
 
 
Changed oil & filters
  
March.31, 2005
 
 
Removed & replaced cylinder packing on right hand side
  
August.16, 2005
 
 
Removed old clutch & replaced with correct part, old clutch had wrong thickness sleeve for throwout bearing,
 
checked gearbox alignment
  
?
 
 
Changed gear oil in rotation head & funk box, cleaned dust collectors, changed inner & outer air filters, changed
 
deck engine oil & filters, changed truck oil & filters, replaced fuel, oil & receiver pressure gauges, replaced truck
 
air filter, replaced shutdown solenoid on deck engine, greased derrick, deck engine & under rig, checked rear ends
 
& transmission, replaced fuel filters on truck engine, greased water pump, added one gallon of 40W oil to water
 
pump, adjusted brakes
  
February.8, 2006
 
 
D.O.T. inspected, repaired R.H. & L.H. front turn signals, greased rig, adjusted brakes, changed carrier engine oil,
 
checked all fluid levels, replaced up & down cylinder closest to drillers stand
  
  
February.22, 2006
 
 
Replaced all front air hoses on rig
  
April.11, 2006
 
 
Removed one link from both chains & adjusted
  
March.20, 2007
 
 
Changed oil & filters, replaced winch & water pump valve, replaced slow feed valve, replaced compressor cooler,
 
replaced air filters, installed new roller on jig boom
  
April.11, 2007
 
 
Replaced slow feed pump, drained gearbox & refilled
  
April.19, 2007
 
 
Replaced breakout wrench & slow feed spool valve
  
May.7, 2007
 
 
Replaced top head chain timing tube, rewired engine electrical system, replaced right side pull down cylinder &
 
right rear jack cylinder
  
May.30, 2007
 
 
Cleaned air filters and pre-cleaners, pop tested injectors and tuned up engine, replaced left top head motor
  
July.30, 2007
 
 
Replaced carrier main air tank
  
February.4, 2008
 
 
Repacked front wheel bearings, replaced front brake shoes & wheel seals & changed oil in transmission
  
February.22, 2008
 
 
Replaced injectors & tuned up carrier engine, replaced rear brakes, wheel bearings, races & seals on both sides
 
of both rear axles, changed deck engine oil & filter & hydraulic oil & filter, changed compressor oil & seperator filter
 
replaced slow feed control valve
  
June.27, 2008
 
 
Removed deck engine, replaced clutch release collar & fuel return line, adjusted top head chains
  
July.10, 2008
 
 
Replaced wiper motor, arms & blades, installed new manual seat in cab
  
July.11, 2008
 
 
D.O.T. inspected
  
August.4, 2008
 
 
Replaced u-joints and yokes in fan drive line
  
?
Replaced left side top head cylinder & steamed around crack in derrick
  
August.6, 2008
 
 
Installed lock bolt for swivel on rotation head adjustment, repacked swivel, repaired spring for slow feed detent
  
August.11, 2008
 
 
I,", installed one inch ball valve in cylinder system, replaced selector valve & shuttle valve for head travel
  
August.12, 2008
 
 
Replaced both top head cylinders
  
August.13, 2008
 
 
Replaced slow feed pump
  
August.14, 2008
 
 
Smoothed bullshaft & replaced packings, sprocket & wear sleeve in bonnett
  
August.18, 2008
 
 
Steam cleaned engine, pump, gear box & control panel, replaced slow feed valve & main pump, adjusted torque
 
limiter, checked engine for leaks, cleaned radiator & cooler
  
August.19, 2008
 
 
Replaced both star cover gaskets & tightened turbo supply line, resealed breather on right hand valve cover
  
August.27, 2008
 
 
Replaced left pull down cylinder
  
  
September.18, 2008
 
 
Replaced left muffler & throttle cable on deck engine
  
September.23, 2008
 
 
Replaced 21/2' X 25" hose from Tee Tank to compressor discharge
  
December.2, 2008
 
 
Replaced deck engine fan belts
  
August.5, 2009
 
 
Replaced discharge hose from compressor to tee tank
  
August.31, 2009
 
 
Repaired cab lights & adjusted brakes
  
September.1, 2009
 
 
Replaced dimmer switch, turn signal switch, low air switch, cab marker light, horn button, rear service brake valve,
 
left rear brake chamber & D.O.T. inspected
  
April.23, 2010
 
 
Cleaned compressor coolers inside & out, changed filters, changed compressor fluid & seperator, replaced
 
discharge temperature gauge in control panel, ran on high side for one hour, temperature 198 degrees


MANUFACTURERS WE PROUDLY REPRESENT:

TXUsedEquipment.com | Used Drill Rigs Inventory | Drill Rig Services | The Used Drill Rig Difference | Drill Rig Manufacturers | About TXUsedEquipment.com | Contact Venture Drilling Supply
Contact Us

Pin It on Pinterest

Share This
Subscribe To Our Newsletter

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our team.

You have Successfully Subscribed!